100 Ton Crane Load Chart Metric: A Comprehensive Guide

When it comes to heavy lifting operations, the 100 ton crane load chart metric is an essential tool for ensuring safety and efficiency. This guide will delve into the details of the 100 ton crane load chart metric, covering various aspects such as its purpose, components, and practical applications.

Purpose of the 100 Ton Crane Load Chart Metric

100 ton crane load chart metric,100 Ton Crane Load Chart Metric: A Comprehensive Guide

The primary purpose of the 100 ton crane load chart metric is to provide a standardized reference for crane operators and engineers to determine the safe lifting capacity of a crane. By following this chart, they can ensure that the crane is not overloaded, which could lead to accidents and damage to equipment.

Components of the 100 Ton Crane Load Chart Metric

The 100 ton crane load chart metric consists of several key components, including:

  • Lifting capacity: This refers to the maximum weight the crane can safely lift. The chart typically displays the lifting capacity in metric tons.

  • Radius: The distance from the crane’s lifting point to the load’s center of gravity. This is crucial for determining the crane’s stability and the load’s distribution.

  • Load center: The point at which the load is suspended from the crane. This affects the crane’s stability and the load’s distribution.

  • Outreach: The distance from the crane’s lifting point to the load’s center of gravity. This is important for determining the crane’s reach and the load’s distribution.

  • Boom angle: The angle at which the crane’s boom is positioned relative to the horizontal. This affects the crane’s lifting capacity and stability.

Understanding the Load Chart

The 100 ton crane load chart metric is typically presented in a tabular format, with columns representing different boom angles and rows representing different radii. To understand the chart, follow these steps:

  1. Identify the desired boom angle and radius.

  2. Locate the intersection of the boom angle and radius columns.

  3. Read the corresponding lifting capacity value at the intersection.

For example, if you are using a crane with a 45-degree boom angle and a radius of 20 meters, you would find the intersection of the 45-degree column and the 20-meter row. The value at this intersection would be the crane’s lifting capacity for that specific configuration.

Practical Applications

The 100 ton crane load chart metric is widely used in various industries, including construction, manufacturing, and transportation. Here are some practical applications:

  • Construction projects: Crane operators can use the chart to determine the safe lifting capacity of cranes when lifting heavy equipment, such as steel beams or concrete slabs.

  • Manufacturing: Engineers can use the chart to design and select cranes for lifting heavy machinery and components.

  • Transportation: Crane operators can use the chart to ensure that cranes are used safely when loading and unloading heavy cargo, such as shipping containers or vehicles.

Table: 100 Ton Crane Load Chart Metric Example

Boom Angle (掳) Radius (m) Lifting Capacity (ton)
0 10 100
15 15 95
30 20 90
45 25 85
60 30 80
75 35 75